The client required a two-tier mezzanine system to be installed within an active production environment, where downtime and site disruption needed to be kept to a minimum.
We worked closely with the reseller and end user to coordinate the design as a single, integrated package. Detailed design development allowed us to plan around existing services and structural constraints, ensuring the system could be installed without impacting ongoing operations.
The mezzanine was custom fabricated at our Epping facility and delivered as a coordinated install. Installation was carried out in a staged, after-hours program to suit the client’s production schedule, allowing the full system — including specialised access equipment — to be delivered efficiently with minimal disruption onsite.